emerson@netdevops:~/proxbox-api$ gh release view v0.0.25 --repo emersonfelipesp/proxbox-api
back to releases / back to project
v0.0.25
- author
- emersonfelipesp
- created
- 2026-10-02 23:27 UTC
- target
- main
- downloads
- 0
emerson@netdevops:~/proxbox-api$ cat RELEASE_NOTES.md
proxbox-api 0.0.25
This release makes synchronization more robust and safer on estates with several Proxmox endpoints and clusters.
Fixes and improvements
- Nightly schema refresh. The schema contract check accepts both NetBox 4.6 and 4.7 virtual machine schema names, so the scheduled refresh works against current NetBox.
- Pinned granian. The granian container images and the CI end-to-end container install a validated, pinned granian version, with a guard test that keeps the pin consistent.
- Node-interface synchronization (opt-in
sync_node_interfaces). A failed VLAN synchronization no longer clears existing VLAN assignments, and VLAN, IP and MAC failures, including partial responses without a persisted record, are reported as warnings with a degraded result in the REST response (only when degraded), the SSE events and full update. - Shared-owner detection. During sidecar hydration, two NetBox VMs claiming the same Proxmox owner (endpoint, cluster, VMID and type) are detected, including when one is outside the selection: lenient runs skip every claimant with a warning and report the stage degraded; strict requests fail before any write.
- Verified-cluster matching. A VM whose only endpoint-keyed candidate has no verifiable cluster (missing or unassigned) is skipped with a structured warning and the stage is reported degraded, instead of being updated or duplicated. Missing cluster data is completed with bounded concurrency, and the Python and Rust reconciliation engines agree.
- Test reliability. The console relay rejection tests are hardened against a test-harness cancellation race.
Compatibility and upgrade
No database migration and no change to the public authentication contract. Compatible with proxmox-sdk 0.0.15, netbox-sdk 0.0.13 and the netbox-proxbox 0.0.27 line. Responses gain warnings and degraded fields only when a staged stage skipped a VM or a node-interface sub-sync failed.
Deploy the exact 0.0.25 package or container, restart every backend worker, verify the health endpoint, then run one node and one virtual-machine synchronization before resuming scheduled jobs.
emerson@netdevops:~/proxbox-api$ gh release download --pattern '*'